Hi Gurus ,
I have one requirement related to storage to storage location stock transfer through MRP within the same plant .
As per SAP r/3 standard I have created one MRP area & maintained the receiving storage location in it . While maintaining the material master I have also maintained the material in MRP area as well with MRP type "VB" . System is generating the STPR perfectly when stock falls below the reorder level .
My question is that can we transfer the requirement from plant to MRP area , so that planning in MRP area should not be based on reorder level should done be based on the actual requirement .
As per requirement from user , requirement should be pass directly from plant to MRP area so that we can avoid using the reorder point & system to generate the STPR based on actual requirement .
Thanks ,
Regards ,
Aman