Re: Standard Price change in CKMLCP & CKME
Hi Toidi Thank you for your support.I found someone's action dated on previous month.User open the period on 30th September night, but someone sneaked the movement as dated on 29th. or 28th after...
View ArticleRe: ALV pop up with 3 fields
Currently i am using oops ALV,so how to display popup with 3 fields.Should we use the REUSE* FM's or any other method to display.
View ArticleRe: Is There any Version Of SAP Named Everest Available In Mareket?
Hi Ankush, I don't think SAP Everest is supported by SAP now (not sure) and it is basically for financial reporting purpose. Thanks,Hamendra
View ArticleTravel request creation in ESS & MSS
Hi Gurus, I am new to travel request, Please let me know what are the perquisites for to implement travel request in Portal. Business functions & Services Required authorization &...
View ArticleRe: F-02/FB50/FBCJ/FM
You can set the option in FMDERIVE to 'overwrite', so every value, even if entered manually, would be overwritten by FMDERIVE rule. Alternatively, it is a question of field status group: you can...
View ArticleHow to set autorithy to spool object...(if they are created via SAP Standard)
Hi,how to set a special authority to spool entries if they are build via sap standard programms. So that in Transaction SP01 not evrybody is able to look at it.Regards,Timo
View ArticleRe: --kiosk effect to irpt page
Hi Eswaraiah,You can include the code snippet in the p;age you want to open. Even if you use it in your main page, it would work but it will change document mode for main page as well. So all the htmls...
View Articlepeformance issue
Hi, We are facing this issue. If we copy 10GB of data from Table A to Table B, Table B supposed to have 10GB size however it is allocating almost 1.6 times of parent table(so Table B is having 18GB).We...
View ArticleRe: Returns within specified number of months
Through standard, this is not possible. While creating the return sale order, system should validate the Clearing Date (AUGDT) from BSEG table with FKDAT from VBRK and if it exceeds 9 months, then...
View ArticleRe: DP_FATAL_ERROR => Gateway could not be started
Thank you everyone, I use a backup of the old profile. The system started and work.
View ArticleNo entry in table RSBASIDOC for myself connection BIDCLNT101
Hi Gurus, When I tried to enable 0PUR_C01 in BI Content I received this error message as per title. This is from SAP BI DEV which I get the source system(datasource from) ECC QAS. I did check in...
View ArticleRe: How does an element on a screen which refered to DDIC interact with ABAP?
Thanks for responding. SORRY , I am a beginner so I may haven't described clearly enough. for example,the "Airline" has an input field called "DEMO_CONN-CARRID".It comes from DDIC type DEMO_CONN, now...
View ArticleRe: BO-FIPP
Hi Modak, Regarding Issue 2: I have created a zpost method and kept it as dialog and asynchronous.I have added terminating event as "Completed".I am having only this one activity in approval branch.Now...
View ArticleRe: Issue regarding upload of wrong Cost Center
Are you uploading assets with cost center through LSMW or you are just uploading cost center? If you are doing the Asset upload with cost center, then check the AO22 - Field status setting of Cost...
View ArticleRe: ECC 6 EHP7 IDES Installation
There are 2 SWPM version1) 7**SWPM****.SAR2) SWPM*******.SAR I am using SWPM*******.SAR not 7**SWPM. Should I go with 7****SWPM****.SAR???? -RegardsRohit
View ArticleRe: Define GL Account For Reason for Movement
As per the standard configuration based on reason code it is not possible to trigger different G/L account as the postings happen respect to the MVT type. The reason codes more helpful for reporting...
View ArticleRe: VA01 Screen Lock after Item Validation in USEREXIT_SAVE_DOCUMENT_PREPARE
Hi Sathish, Its SO line item validation on Order Data Tab. User should maintain Purchase order item for particular condition. if po item is not maintain then the validation throw an error. the...
View ArticleRe: Error while creating SAP GUI short cut
Hi Hugo, Thanks for your response. I have made changes to the GUISecurity Changes already. I even created a security rule, for “C:\Users\Desktop”with Read, Write and Execute options. Though the...
View ArticleRe: ECC 6 EHP7 IDES Installation
Dear but in selection you are selecting System copy also check SWPM which you have selected that matches with NETWEAVER7.1x i think you seleted NETWEAVER7.0x Regards
View Article